Monthly Archives: September 2009

Extreme Trailer Makeover (Part 2): Torching the Trailer

The first step in repairing the 53-foot drop deck trailer that came to Maple Grove Enterprises is to remove all the cross members. In the picture, you can see MGE employee Dustin George starting to remove them with the torch. After all the cross members are removed, it’ll be ready for sandblasting. Continue reading

Posted in Metal Fabrication, Welding | Tagged , , | Leave a comment