The drop deck trailer is finished! As you can see from the “before” photo, it has come a long way. The trailer was sandblasted, cross members were cut off, and new cross members were added. The trailer required custom fabrication of the tool boxes and modifications for the addition of the head rack, and it received a full 3-coat system paint job. Now our customer will be proud to take it on the road!
Links
Archives
Subscribe to the MGE Blog
Tags
advanced 3-coat system paint job Afgritech Agriculture Albert Paley BOMA budget Buffalo building owners ceramic coatings chemical plant Chief Industries Custom Conveyor Custom metal fabrication Dairy Farm epoxy coatings Feed Mill Floor Coatings Grain Storage industrial maintenance Millwrighting municipal water New York NY Farm Show NYSERDA Primary Containment pump efficiency reduced energy costs Safety sandblasting Secondary Containment steel sculpture tank linings tractor restoration Trailer repair truck repair Welding